Cape Cod Hospital: Concrete Repair and Parking-Deck Waterproofing
Water leaking through the parking deck at Cape Cod Hospital required attention to both the damaged concrete and the waterproofing system. Topcoat completed concrete repairs and installed a traffic-bearing waterproofing system across the 14,500-square-foot deck in Hyannis, Massachusetts.
Project Details
- Location: Hyannis, Massachusetts
- Facility: Cape Cod Hospital
- Client: Cape Cod Healthcare
- Project area: 14,500 square feet
- Completed: May 2025
- Services: Concrete repair, surface preparation and traffic-bearing waterproofing
- Installed system: Neogard Auto-Gard FC




