Water leaking through the parking deck at Cape Cod Hospital required attention to both the damaged concrete and the waterproofing system. Topcoat completed concrete repairs and installed a traffic-bearing waterproofing system across the 14,500-square-foot deck in Hyannis, Massachusetts.

Project Details

  • Location: Hyannis, Massachusetts
  • Facility: Cape Cod Hospital
  • Client: Cape Cod Healthcare
  • Project area: 14,500 square feet
  • Completed: May 2025
  • Services: Concrete repair, surface preparation and traffic-bearing waterproofing
  • Installed system: Neogard Auto-Gard FC

Water Intrusion Through an Existing Parking Deck

The parking deck required concrete repairs and a waterproofing system to address leakage affecting the emergency department below. The work needed to address the deteriorated areas and prepare the deck for the new traffic-bearing system.

Repairing the Concrete Before Waterproofing

Topcoat completed full-depth repairs in the designated areas and prepared the deck for the specified waterproofing system. Addressing the damaged concrete formed an essential part of the restoration before the new system was installed.

The concrete repair and surface preparation work established the substrate conditions needed for the coating application. This stage required attention to the repair areas and the interfaces between the existing concrete and the new work.

Concrete removed down to the metal decking during repairs on the Cape Cod Hospital parking deck
Concrete removed to the metal decking in a repair area.

A Traffic-Bearing Waterproofing System for the Deck

Following repair and preparation, Topcoat installed Neogard Auto-Gard FC across the parking deck. The project combined concrete restoration with a waterproofing system intended for vehicular traffic. Learn more about our traffic coatings.
Topcoat crew washing the Cape Cod Hospital parking deck surface during preparation
Crew washing the deck surface during preparation.

A Restored Deck and Resolved Leakage

Topcoat repaired and waterproofed the 14,500-square-foot parking deck, resolving the leakage affecting the emergency department below. Topcoat is based in Hyannis; see our other work on commercial and industrial flooring on Cape Cod.

14,500 SF Restored

Concrete Repaired & Waterproofed

Emergency Department Leakage Resolved

Overview of the finished gray waterproofing on the Cape Cod Hospital parking deck
Completed parking-deck waterproofing at Cape Cod Hospital, Hyannis, Massachusetts.

Before, Repair and Finished

cape cod hospital deck before 1
Before: Cape Cod Hospital parking deck, Hyannis, MA
cape cod hospital deck repair 1
During: concrete repair area on the deck
cape cod hospital deck finished 1
Finished: gray waterproofing system, Cape Cod Hospital parking deck

Project Gallery

Related Services

Concrete Surface Preparation & Repair

Traffic & Pedestrian Coatings

Planning Repairs or Waterproofing for Your Parking Deck?

Share the location, approximate deck area, visible damage and any history of water intrusion. Topcoat will discuss the assessment, preparation and system requirements needed to define the next step.

Call (774) 470-4951